SH basement new floor.JPG
A primary goal of the Jail's basement renovation was to refurbish the floor. The previous concrete slab in the basement was significantly degraded and could not be safely used by the building's tenants.

SH basement demo (4).JPG
This particular section of the Jail basement needed new support beams to safely bear the load of the floor above. In the photograph, crew employees can be seen securing the new support braces into the concrete below.

SH basement demo (2).JPG
Many areas of the basement of the Sheriff Residence & Jail required extensive repairs. This section of the basement lacked load-bearing beams at critical junctures requiring additional bracing to add support. In addition, it also required a new floor…

Jail 1st Flr kitchen pano (2).JPG
The first floor kitchen of the Sheriff's Residence & Jail after the renovation. Among the new tenants, a restaurant is slated to begin operating by early August 2023.

Jail 1st Flr demo pano.JPG
The first floor of the Sheriff's Residence & Jail prior to the renovation. The steel bars on the windows are from the building's past and serve as a reminder of the vital role that the Sheriff's Residence and Jail played in securing suspects…

E821C205-BD7F-40B3-B644-E5DBAEBAFA4C.jpeg
The exterior structure of the new building connector is nearing completion with windows being framed to allow for ample natural light to the stairwell.

Exterior Connector.JPG
Connecting stairwell between both buildings nears completion; elevator shaft added to improve accessibility. A primary goal of the new renovation was to update the building to be in compliance with the Americans with Disabilities Act. An elevator is…

Exterior steel work.JPG
In preparation for a new stairwell to join the Old Courthouse and Sheriff's Residence/ Jail, the construction crew prepares an exterior steel structure.

Parking lot (2).JPG
Located across the street from the Old Courthouse Center, the newly-paved parking lot has been a welcomed addition to the downtown area of Woodstock.

Geothermal work.JPG
The renovation includes the construction of geothermal vents underneath the parking lot to provide low-cost heating and cooling for the Old Courthouse Center. At a specific depth, the temperature underground is stable year around regardless of…

southwest valley and gutters.JPG
The extensive damage to the Courthouse's roof was a driving force behind the City's motivations to renovate the property. Moisture from rain and humidty was able to enter the building unabated leading to excessive damage in many parts of the…

CIMG1032.JPG
After its conversion from government building to privately-operated site, the Old Courthouse and Jail became home to restaurants and retail stores alike.

Rubble Room ceiling install (2).JPG
While in the process of renovating the Courthouse, the construction crew installed new ceiling support beams in key places along the basement to join several walkways together.

Rubble room wall rebuild.JPG
The construction crew is in the process of rebuilding a section of the Courthouse's basement. The room's lack of a ceiling prevented three walkways from being joined together.

Courtroom air intake.JPG
Courtroom ceiling was restored to its former glory with a fresh ceiling, new paint, and a rebuilt air intake system.

Jail LL concrete.JPG
Staff from Elliot Concrete work to replace the Jail's lower level concrete floor. Employees in the photograph are seen leveling the newly poured concrete to ensure a smooth surface. The newly renovated Old Courthouse Center is expected to maintain a…

Jail basement pano (2).JPG
A panorama view of the Sheriff Residence & Jail's basement in the process of being renovated. Metal framing can be seen in the back, new subfloor has been laid, and doors were installed as well.

Jail basement pano.JPG
Prior to the renovation, the Sheriff Residence & Jail's basement was in an unusable state. From unlevel ground to exposed piping, the basement was unable to be used by tenants.

Courtroom painting.JPG
The Old Courthouse's courtroom was in need of a new paint job due to the moisture damage caused by the hole in the roof.

Courtroom plaster demo.JPG
The plaster was removed from the Old Courthouse's main courtroom. The room is being prepared for new primer, paint, and trim.

1488EFD0-2C7E-4FFB-BE12-D069DFA7D776.jpeg
The repairs to the Courthouse's tin ceiling were completed by the team at Bulley & Andrews. The crew attached new tin squares to the ceiling to recreate the design of the Old Courthouse.

CH 1st Flr NE tin ceiling (2).JPG
The tin ceiling of the Courthouse was in rough shape prior to the renovation project. Much of the damage stemmed from moisture entering the building through a hole in the roof near the flag pole.

CH 1st Flr NE reinstalled ceiling with primer.JPG
Prior to the renovation, the tin ceiling of the courthouse's courtroom was extensively damaged from a hole in the roof. In this photograph, the ceiling was primed and painted, restoring the ceiling to its previous condition.

Jail_demo__2__MOV_AdobeExpress.gif
Holding cells in the basement from the Jail's past were demolished in preparation for the renovation. The worker in this photograph can be seen using a power tool to cut through the cell bars.